A virtual presentation explaining revisions to the Downtown Links Deck Plaza was given to an area neighborhood on November 16.

A PDF of the presentation is available here.

The Deck Plaza will be located at 6th Street and 9th Avenue, near the Citizens Warehouse. Although the plan had to be revised, the new design maintains the original intentions:

– Provide multiple scales of Gathering Space
– Native vegetation, water harvesting, and wildlife habitat
– Context sensitive materiality
– Act as a bike and pedestrian oriented gateway towards downtown

A video walkthrough of the plaza can be viewed on Vimeo.

Several 3D, rotatable images can be viewed on My Lumion.

A video of the Skylophone, similar to the proposed Grand Pianophone public art piece, can be viewed on YouTube.

 

 

 

 

 

 

 

This Phase 3 project update from Tucson Department of Transportation and Mobility was presented to the Dunbar Spring Neighborhood on March 16, 2020.

And update project map was also presented.

 

Downtown Links Phase 3 Roll Plot 100 Scale Corridor – 03-12-2020

 

On March 2, 2020, a Downtown Links Project Update for Phase 3 was presented at the Downtown Neighborhoods and Residents Council (DNaRC) meeting.

View the presentation here (PDF file reader required.)